Our powerful JS Calendar component
I'm encountering an issue with the day shift on Firefox.
This is the configuration I'm using:
- 2022-12-08 10_02_12-scheduling-frontend – calendar.config.tsx.png (27.31 KiB) Viewed 1228 times
And this is the result on Chrome:
- 2022-12-08 10_01_12-.png (34.59 KiB) Viewed 1228 times
And on Firefox:
- 2022-12-08 10_00_52-.png (31.31 KiB) Viewed 1228 times
For some reason on Firefox, the day goes only till 5AM, while the configuration is set to 6AM.
Can you please upload a full minimal test case so we can debug it?
It looks like those two screenshots are of different views.
The top one is a ResourceView with multiple weekViews side by side.
The bottom one looks like a solo WeekView. So are they both configured in the same way?