Post by kt@tp »

Hi,

I am a scheduler Pro user. We are not able to schedule events with duration more than 5 yrs. The duration always goes back to 1825 days if the endDate is 5 yrs later. This is reproducible in any of the online demos.

I found this forum post on a similar topic viewtopic.php?p=81867#p81867, but it seems inactive now. Are you able to provide an estimation as to when the feature will be available. In the meanwhile, is there a workaround that I try?

Thanks


Post by arcady »

Hello,

There is a special config on the project model https://bryntum.com/products/gantt/docs/api/Gantt/model/ProjectModel#config-maxCalendarRange
You need to enlarge its value if you operate a long running projects.

Best regards,
Arcady


Post by kt@tp »

Thankyou, that worked!