Our powerful JS Calendar component


Post by [email protected] »

Hi!
I'm seeing some behavior that I believe is a bug. It's reproducible with this demo: https://bryntum.com/products/calendar/examples/confirmation-dialogs/
and I'll attach a gif I made using the above example page. I am using Chrome/Edge.
When using the confirm dialog with drag and drop, if the event is dragged and dropped at the boundary of the view and causes the calendar to scroll vertically then when the confirm pops up the background continues to scroll. Then when the event is confirmed, it is not set to the expected drop time but the instead set to end of the day (11:30pm).

Attachments
DragDropScrolling.gif
DragDropScrolling.gif (9.94 MiB) Viewed 9126 times

Post by ahmadzaheer »

Hello,

Thanks for reporting this bug. We will fix this. Here is a ticket which you can track regarding this: https://github.com/bryntum/support/issues/13019

Regards,
Ahmad Zaheer


Post Reply