I am encountering a problem with event names when switching days in the scheduler.
Sometimes the event name which starts on the previous day or continues to the next day does not have the event name or the name is partially visible. My code is using "shiftPrevious" or "shiftNext" functions to switch between days.
Could you please advise me on how to fix this?
Attachments
missing_name_1.png (20.82 KiB) Viewed 416 times
half_of_name.png (11.7 KiB) Viewed 416 times
name_out_of_borders.png (12.66 KiB) Viewed 416 times
scheduler.shiftNext()
// and
scheduler.shiftPrevious()
in different order and I don't see that problem. Maybe some specific configuration required?
Please try to reproduce it with our demos and provide steps to reproduce.
If required, apply minimal changes to our example and share with us.
Or zip and attach a test case that we could run and debug.
When a new event is created which starts outside the visible date and continues in the visible date, the event name doesn't show up after saving. Only after clicking to create another new event the name shows up.
Attachments
creating_new_event.png (92.36 KiB) Viewed 398 times
event_name_missing_demo.png (96.91 KiB) Viewed 398 times
Seems like position:sticky doesn't activate until a scroll happens. I will experiment if there's anything which we can do to "wake up" the DOM and get it to stick the event inner element correctly.