I understand Stack, Pack, and Overlap T/F. Is there currently a way to have the events act more like flex?
What I mean by this is if I had an event to start on 3/27/23 through 3/30/23 and another event to start from 3/30/23 through 4/3/23.
If I dragged another event between these two mentioned events, the latter would shift out (right) and make room for the one currently being dragged in.
It would then need to shift all others events to the right to make sure there is no overlap.
Hey mikemcs,
Just to be sure that we get correct, using the screenshot from our demo https://bryntum.com/products/schedulerpro/examples-scheduler/layouts/
Your suggestion would be that "Appointment #2" should be below "Appointment #1" because the start date from #2 is after the start date of #1?
-
Attachments
-
- Screenshot 2023-03-28 at 16.23.04.png (18.53 KiB) Viewed 274 times
Actually, what I am looking for is that when Appointment #1 was dragged onto the schedule that Appointment #2 would slide over and make room for Appointment#1 which would mean that allowoverlap would be set to false.
I am looking to see if there is a way to have the Events reschedule themselves if another event gets dragged onto the schedule. I am using SchedulePro
- Sample.jpg (75.79 KiB) Viewed 258 times