Hello team,
I am working with Scheduler Pro and ran into an inconsistency when overriding the overlappingEventSorter
function.
In the demo code linked below (which should work when pasted into one of your demo examples), I've implemented a custom overlappingEventSorter
callback that should prioritize events with type == 'holiday'
before events with type == 'non-holiday'
.
However, you can see in the attached screenshot that the left-most and bottom-most events render correctly, but the middle two overlapping events are swapped. The blue 'non-holiday' event should be sorted below the red 'holiday' event.
Is this a defect with the library? Or is prioritizing non-startDate fields not supported?
Thanks!